This website uses cookies
More information
Avfuel Corporation
Avfuel Corporation
The monthly news publication for aviation professionals.

Why visit ACE ’25?

Related background information from the Handbook...
The monthly news publication for aviation professionals.

Request your printed copy

Peregrine improves G150 flap/slat operation
Peregrine Aviation can now fit Gulfstream G150s with heaters to prevent inadvertent freezing of the aircraft's actuator components that control wing flaps and slats positions.
The STC covers installation of heaters to prevent inadvertent freezing of G150 actuator components.

On behalf of Gulfstream Aerospace, Colorado-based aircraft engineering and certification company Peregrine Avionics has completed a supplemental type certificate covering the installation of flap and slat actuator heaters to ensure improved high‐lift system operation in cold weather landing situations.

The heaters ensure the reliable operation and deployment of the leading‐edge slats and flaps in all operational environments.

A no‐flap/no‐slat landing configuration can lead to a steeper descent path and high speed landings without flap or slat deployment, possibly requiring a diversion away from the planned destination airport. The operational impacts of this may include costly diversions to an alternate destination with a runway of suitable length, passenger delays and increased direct and indirect operational costs.

Peregrine provided all engineering, test and certification data needed to obtain the STC approval. The components, heaters control systems and installation documents are available as a package directly from Peregrine. The STC does not modify the G150 flap/slat drive system including controls, indications, safety mechanisms or recommended lubrication maintenance procedures.

"Peregrine is ready to provide a turnkey installation of the system at our Denver area Part 145 repair station partner, or it can supply the STC and installation components for installation by the G150 operator's preferred authorised repair station,” says president David Rankin.

Other News
 
Gulfstream G400 completes first flight
August 19, 2024
The G400 departed Savannah/Hilton Head International airport in Georgia at 9:04 am and returned two hours, 54 minutes later, having reached a speed of Mach 0.85 and altitude of 41,000ft/12,497m.
NOAA puts pen to paper for modified G550
July 22, 2024
Funded in part by the Inflation Reduction Act, as part of President Biden's Investing in America agenda, the fully instrumented aircraft is expected to join NOAA's fleet in 2028. This will be NOAA's second G550.
Hariharan brings sustainability expertise to Gulfstream
July 16, 2024
Gulfstream is innovating for a sustainable future and has appointed Smitha Hariharan as its vice president and chief sustainability officer to drive the transformation.