This website uses cookies
More information
The monthly news publication for aviation professionals.
Related information from the Handbook...

• Dassault Aviation
Aircraft

• Falcon 8X

• Interiors

BAN's World Gazetteer

• France
The bimonthly news publication for aviation professionals.

Request your printed copy

First two 8Xs to undergo cabin completions
Two Falcon 8X aircraft have arrived at the manufacturer's completion facility in Little Rock, Arkansas. One of the two, 8X s/n 03, arrived in Little Rock during the summer for installation of a full interior that will conform to the 8X cabin comfort and functionality test programme.
Read this story in our November 2015 printed issue.

Two Falcon 8X aircraft have arrived at the manufacturer's completion facility in Little Rock, Arkansas. One of the two, 8X s/n 03, arrived in Little Rock during the summer for installation of a full interior that will conform to the 8X cabin comfort and functionality test programme. This aircraft will also commence an around-the-world operational test campaign to demonstrate reliability and performance in different conditions of flight, including high and low temperature, high humidity and high altitude operations.

The second unit to enter the completion line, 8X s/n 04, flew to Little Rock from Dassault Aviation's Bordeaux-Mérignac final assembly facility in early October. This aircraft will be the first production unit to be delivered to a Falcon customer. Nine other aircraft are currently in various stages of assembly on the Mérignac line as Dassault's new flagship ramps up production.

Other News
 
Vista and Dassault sign up for BAAFEx 2027
November 1, 2026
More than 20 exhibitors have been confirmed for the Singapore show, which is expected to be 50 per cent bigger than its inaugural 2025 edition.
Falcon 2000 fleet will receive EASy IV retrofit by 2029
October 22, 2026
The upgrade, built on Honeywell Aerospace's Primus Epic platform, brings the 700-strong Falcon 2000 EASy fleet to the same cockpit standard as the Falcon 6X and 8X.
Mérignac marks ten years supporting Falcons
October 5, 2026
The facility is equipped to handle structural repairs, which typically require engineering involvement, as well as EASy IV avionics upgrades and other STC solutions such as Starlink in-flight connectivity system installation.